Bunbury, Maintenance Dredging
Bunbury Harbour and Shipping Channel Maintenance Dredging
Southern Ports Authority (Port of Bunbury) requires regular maintenance dredging within the Port of Bunbury. The Trailing Suction Hopper Dredger “Modi R” is operating on a twice-per-annum campaign basis, where she is dredging to the needs and requirements of Southern Ports Authority. All dredged materials are being disposed of as required at the permit provided disposal site.
Before dredging can commence, RN Dredging is responsible of completing a hydrographic pre-dredge survey, which primarily dictates the priority of dredging operations during the campaign(s). RN Dredging also carry out all progress- and post dredge survey work.
- Location: Bunbury, Australia
- Scope: Approximately 200,000 m³ annually
- Client: Southern Ports Authority
- Year: 2018-2023
The fleet that made it possible
- Modi R
Modi R
Download specifications- Hopper capacity
- 1,393m3
- Length overall
- 67.05m
- Breadth
- 12.80m
- Draught loaded
- 3.80m
- Draught unloaded
- 1.50m
- Dredging depth
- 20.00/24.00m
Other projects
Cockburn Sand Supply
Explore Project
Purpose:
Supplying of shell sand, dredged from a specific area, offshore at Owen Anchorage, West Australia….
- Location:
- Owen Anchorage, Western Australia
- Scope:
- 1,500,000 m³ annually
- Client:
- Cockburn Cement Ltd.
- Year:
- 2018-2030
Bunbury
Explore Project
Purpose:
Maintenance dredging within the Port of Bunbury….
- Location:
- Bunbury, Australia
- Scope:
- 200,000 m³ annually
- Client:
- Southern Ports Authority
- Year:
- 2018-2023
Storstrøm Bridge
Explore Project
Purpose:
Dredging of temporary work channels and other various tasks…
- Location:
- Zealand, Denmark
- Scope:
- 923,000 m3
- Client:
- Storstroem Bridge Joint Venture I/S
- Year:
- 2019-2023
Seabed Boulder Removal
Explore Project
Purpose:
Preparation for the arrival of a jackup vessel to repair a wind turbine generator…
- Location:
- Wikinger OWF (GER)
- Scope:
- 22 pcs
- Client:
- Siemens Gamesa
- Year:
- 2023
Courseulles offshore wind farms
Explore Project
Purpose:
Installation of 82 pcs of rock beds approx. 13×18 m. at 24 locations…
- Location:
- Courseulles (FRA)
- Scope:
- 62,000 ton of rocks
- Client:
- Saipem S.A.
- Year:
- 2023
Guyana
Explore Project
Purpose:
A long time charter contract for continuous maintenance dredging in entrance channel…
- Location:
- Berbice river, Republic of Guyana
- Scope:
- 160,000,000 m3
- Client:
- Bauxite Company of Guyana Inc. (BCGI)
- Year:
- 2011- 2020
Sao Luis
Explore Project
Purpose:
Maintenance dredging at Pier 1; Pier 3 North and South; Pier 4 North and South…
- Location:
- São Luís, Brazil
- Scope:
- 5,037,152 m3
- Client:
- Vale SA
- Year:
- 2015-2020
Klaipeda
Explore Project
Purpose:
About 30,000 m3 of moraine soil needs to be removed and dumped in offshore dumping grounds….
- Location:
- Klaipeda, Lithuania
- Scope:
- 70,000 m3
- Client:
- Klaipeda State Seaport Authority/BMGS
- Year:
- 2020
Paldiski
Explore Project
Purpose:
Capital Dredging and securing slope of the Quay number 7….
- Location:
- Paldiski, Estonia
- Scope:
- 600,000 m3
- Client:
- Ports of Tallinn
- Year:
- 2019-2020
Cairns
Explore Project
Purpose:
Deepening and widening of the harbor and entrance channel located at the Great Barrier Reef Marine Park…
- Location:
- Cairns, Australia
- Scope:
- 750,000 m3
- Client:
- Ports North
- Year:
- 2019
Vordingborg Port
Explore Project
Purpose:
Deepening of the shipping channel to 10.4 meters and a width of 70 meters…
- Location:
- Vordingborg, Denmark
- Scope:
- 1,800,000 m3 sand, 1,610,000 of boulder clay
- Client:
- Munck Havne og Anlæg A/S
- Year:
- 2018-2019
Talk to us about your next project
Would you like to know more about us and our services? Rohde Nielsen operates globally as a general contractor as well as a subcontractor.
Get in touch