Guyana, Capital and Maintenance Dredging
Maintenance dredging in the Berbice river, Guyana
A long time charter contract for continuous maintenance dredging in entrance channel, loading- and turning basins in Berbice river, including survey operations. Entrance channel total length 23 km, dredging depth 8.3 meters guaranteed.
On average, Viking R achieves an annual removal of 10,000,000 m3 silt by sidecasting and split-dumping.
- Location: Berbice river, Republic of Guyana
- Scope: 160,000,000 m3
- Client: Bauxite Company of Guyana Inc. (BCGI)
- Year: 2011- 2020
The fleet that made it possible
- Viking R
Viking R
Download specifications- Hopper capacity
- 1,010m3
- Length overall
- 66.80m
- Breadth
- 11.85m
- Draught loaded
- 4.33m
- Draught unloaded
- 2.85m
- Dredging depth
- 20.00/24.00m
Other projects
Cockburn Sand Supply
Explore Project
Purpose:
Supplying of shell sand, dredged from a specific area, offshore at Owen Anchorage, West Australia….
- Location:
- Owen Anchorage, Western Australia
- Scope:
- 1,500,000 m³ annually
- Client:
- Cockburn Cement Ltd.
- Year:
- 2018-2030
Bunbury
Explore Project
Purpose:
Maintenance dredging within the Port of Bunbury….
- Location:
- Bunbury, Australia
- Scope:
- 200,000 m³ annually
- Client:
- Southern Ports Authority
- Year:
- 2018-2023
Storstrøm Bridge
Explore Project
Purpose:
Dredging of temporary work channels and other various tasks…
- Location:
- Zealand, Denmark
- Scope:
- 923,000 m3
- Client:
- Storstroem Bridge Joint Venture I/S
- Year:
- 2019-2023
Seabed Boulder Removal
Explore Project
Purpose:
Preparation for the arrival of a jackup vessel to repair a wind turbine generator…
- Location:
- Wikinger OWF (GER)
- Scope:
- 22 pcs
- Client:
- Siemens Gamesa
- Year:
- 2023
Courseulles offshore wind farms
Explore Project
Purpose:
Installation of 82 pcs of rock beds approx. 13×18 m. at 24 locations…
- Location:
- Courseulles (FRA)
- Scope:
- 62,000 ton of rocks
- Client:
- Saipem S.A.
- Year:
- 2023
Guyana
Explore Project
Purpose:
A long time charter contract for continuous maintenance dredging in entrance channel…
- Location:
- Berbice river, Republic of Guyana
- Scope:
- 160,000,000 m3
- Client:
- Bauxite Company of Guyana Inc. (BCGI)
- Year:
- 2011- 2020
Sao Luis
Explore Project
Purpose:
Maintenance dredging at Pier 1; Pier 3 North and South; Pier 4 North and South…
- Location:
- São Luís, Brazil
- Scope:
- 5,037,152 m3
- Client:
- Vale SA
- Year:
- 2015-2020
Klaipeda
Explore Project
Purpose:
About 30,000 m3 of moraine soil needs to be removed and dumped in offshore dumping grounds….
- Location:
- Klaipeda, Lithuania
- Scope:
- 70,000 m3
- Client:
- Klaipeda State Seaport Authority/BMGS
- Year:
- 2020
Paldiski
Explore Project
Purpose:
Capital Dredging and securing slope of the Quay number 7….
- Location:
- Paldiski, Estonia
- Scope:
- 600,000 m3
- Client:
- Ports of Tallinn
- Year:
- 2019-2020
Cairns
Explore Project
Purpose:
Deepening and widening of the harbor and entrance channel located at the Great Barrier Reef Marine Park…
- Location:
- Cairns, Australia
- Scope:
- 750,000 m3
- Client:
- Ports North
- Year:
- 2019
Vordingborg Port
Explore Project
Purpose:
Deepening of the shipping channel to 10.4 meters and a width of 70 meters…
- Location:
- Vordingborg, Denmark
- Scope:
- 1,800,000 m3 sand, 1,610,000 of boulder clay
- Client:
- Munck Havne og Anlæg A/S
- Year:
- 2018-2019
Talk to us about your next project
Would you like to know more about us and our services? Rohde Nielsen operates globally as a general contractor as well as a subcontractor.
Get in touch