São Luís, Maintenance Dredging

Maintenance dredging at Vale terminal (Terminal Ponta da Madeira)

Maintenance dredging at Pier 1; Pier 3 North and South; Pier 4 North and South; Control areas and Access Channel.

Dredge level between -16.00 and -25.50

Tide Variation: 0.00 to 7.00

  • Location: São Luís, Brazil
  • Scope: 5,037,152 m3
  • Client: Vale SA
  • Year: 2015-2020