Tauranga, Port Development

Deepening and widening the entrance channel and port of Tauranga

The project contained the deepening and widening of the entrance channel and inner harbour in port of Tauranga.

The 5,300,000 m3 of dredged material were disposed at a designated spoil ground. The works were carried out by Balder R, Brage R and Gungner R, supported by Skinfaxe R and towed barges.

Furthermore, a full multibeam survey setup was mobilized to ensure high quality monitoring of the works.

  • Location: Tauranga, New Zealand
  • Scope: 5,300,000 m3
  • Client: Port of Tauranga Limited
  • Year: 2015-2016

The fleet that made it possible

  • Balder R
  • Brage R
  • Gungner R
  • Skinfaxe R
Hopper capacity
6,000m3
Length overall
111.30m
Breadth
19.40m
Draught loaded
7.00m
Draught unloaded
3.80m
Dredging depth
35.00/65.00m
Hopper capacity
2,170m3
Length overall
89.59m
Breadth
13.60m
Draught loaded
5.69m
Draught unloaded
4.10m
Dredging depth
30.00/49.50m
Bucket size
5.4-11m3
Length overall
54.88m
Breadth
15.25m
Draught
1.82m
Depth
3.35m
Dredging/Installation depth
20.00m
Length overall
27.02m
Breadth
9.74m
Draught
2.63m
Main engine
2×1,230kW
Speed
12.2kn