Tauranga, Port Development

Deepening and widening the entrance channel and port of Tauranga

The project contained the deepening and widening of the entrance channel and inner harbour in port of Tauranga.

The 5,300,000 m3 of dredged material were disposed at a designated spoil ground. The works were carried out by Balder R, Brage R and Gungner R, supported by Skinfaxe R and towed barges.

Furthermore, a full multibeam survey setup was mobilized to ensure high quality monitoring of the works.

  • Location: Tauranga, New Zealand
  • Scope: 5,300,000 m3
  • Client: Port of Tauranga Limited
  • Year: 2015-2016

The fleet that made it possible

  • Balder R
  • Brage R
  • Gungner R
  • Skinfaxe R
Hopper capacity
6,000m3
Length overall
111.3m
Breadth
19.4m
Draught loaded
7.5m
Draught unloaded
5.4m
Dredging depth
62.0m
Hopper capacity
2,150m3
Length overall
89.7m
Breadth
13.6m
Draught loaded
5.7m
Draught unloaded
4.1m
Dredging depth
49.0m
Bucket size
5.4-11.0m3
Length overall
54.8m
Breadth
15.2m
Draught loaded
2.8m
Towing draught
3.6m
Dredging/Installation depth
20.0m
Length overall
27.0m
Breadth
9.1m
Draught
3.2m
Main engine
2×1,230kW
Speed
12.0kn
Bollard pull
38.5t