Tolmount, Offshore Services

Tolmount Development Project

In July 2020, Rohde Nielsen completed the route preparational works on the Tolmount Development Project for Saipem LTD.

During the last 4 months, a total of 3,000 boulders has been cleared from the pipeline route, 5km nearshore trench has been dredged and backfilled, and 50,000 cubes of clay material has been pre-sweep dredged at offshore locations. This was conducted by the MPV Heimdal R and the BHD Mjølner R assisted by a dedicated survey team from DEEP. In addition, RN assisted their client with the pipeline pull-wire lay – a demanding operation in an exposed location on the UK east coast.

Rohde Nielsen managed to deliver everything within the expected timeframe despite the challenges imposed by the COVID-19 pandemic.

  • Location: Tolmount, United Kingdom
  • Scope: 3,000 Boulders, 50,000 m3 Clay
  • Client: Saipem Ltd.
  • Year: 2019-2020

The fleet that made it possible

  • Heimdal R
  • Mjølner R
Hopper capacity
2,100t
Length overall
84.00m
Breadth
18.70m
Draught loaded
5.80m
Draught unloaded
3.80m
Dredging/Installation depth
up to 100.00m
Bucket size
3.5-16m3
Length overall
51.50m
Breadth
17.00m
Draught
1.80m
Depth
3.00m
Dredging/Installation depth
22.00m