York Development Pipeline, Offshore Services

Trench dredging, pre-sweep and backfilling at the East Yorkshire Coast

Centrica Energy was developing the York Gas reservoir (34 km offshore) by installing a new offshore platform and a new pipeline to flow gas from this new “York” platform into the Centrica’s Easington Terminal.

Saipem Limited was installing this new gas pipeline and had awarded Rohde Nielsen the contract to dredge a 7 km marine trench, from the cofferdam (beach) towards the offshore. For that job, the two BHD’s (Mjølner R and Transport 52) were used.

To Pre-sweep underwater “gravel/clay” dunes we deployed the split hopper suction trailer Njord R. Afterwards the backhoe dredger, Mjølner R, performed the backfilling over the pipe, with the side-casted material to the original seabed level.

  • Location: East Yorkshire Coast (UK)
  • Scope: 7 km of trench
  • Client: Saipem Ltd
  • Year: 2012

The fleet that made it possible

  • Njord R
  • Mjølner R
Hopper capacity
6,000m3
Length overall
111.30m
Breadth
19.40m
Draught loaded
7.00m
Draught unloaded
3.80m
Dredging depth
35.00/75.00m
Bucket size
3.5-16m3
Length overall
51.50m
Breadth
17.00m
Draught
1.80m
Depth
3.00m
Dredging/Installation depth
22.00m