Cockburn Sand Supply

Explore Project

Purpose:
Supplying of shell sand, dredged from a specific area, offshore at Owen Anchorage, West Australia….

Location:
Owen Anchorage, Western Australia
Scope:
1,500,000 m³ annually
Client:
Cockburn Cement Ltd.
Year:
2018-2030

Courseulles offshore wind farms 

Explore Project

Purpose:
Installation of 82 pcs of rock beds approx. 13×18 m. at 24 locations…

Location:
Courseulles (FRA)
Scope:
62,000 ton of rocks
Client:
Saipem S.A.
Year:
2023

Bunbury 

Explore Project

Purpose:
Maintenance dredging within the Port of Bunbury….

Location:
Bunbury, Australia
Scope:
200,000 m³ annually
Client:
Southern Ports Authority
Year:
2018-2023

Storstrøm Bridge

Explore Project

Purpose:
Dredging of temporary work channels and other various tasks…

Location:
Zealand, Denmark
Scope:
923,000 m3
Client:
Storstroem Bridge Joint Venture I/S
Year:
2019-2023

Seabed Boulder Removal

Explore Project

Purpose:
Preparation for the arrival of a jackup vessel to repair a wind turbine generator…

Location:
Wikinger OWF (GER)
Scope:
22 pcs
Client:
Siemens Gamesa
Year:
2023

Vesterhav offshore wind farms

Explore Project

Purpose:
Installation of protective layer of amour rock on the foundations for the offshore wind farms. …

Location:
Vesterhav (DEN)
Scope:
69,000 ton of rocks
Client:
Asso Subsea Limited
Year:
2023

Ostsee Anbindungs-Leitung Project

Explore Project

Purpose:
Construction of an offshore 48” diameter pipeline…

Location:
Baltic Sea (GER)
Scope:
2,000,000m3
Client:
Gascade Gastransport GmbH
Year:
2023-2024

Lillebælt Old Bridge

Explore Project

Purpose:
Installation of 2,100 tons of rock intended for erosion protection…

Location:
Lillebælt (DEN)
Scope:
2,100 ton of rocks
Client:
BaneDanmark Infrastruktur
Year:
2023

Purpose:
Dredging a 6 km long trench, at water depths differing from -3m to -30m….

Location:
Hanö, Sweden
Scope:
3 x 6 km pipes and 6 km cable
Client:
NCC Sweden AB
Year:
2022

Baltic Pipe

Explore Project

Purpose:
Strengthening the European internal energy market….

Location:
Denmark and Poland
Scope:
1,000,000 m3, 1,000 stones
Client:
Saipem Ltd
Year:
2021-2022

NKT – Noss Head, Scotland 

Explore Project

Purpose:
Secure a new power cable by installing a rock berm on top of the cable. …

Location:
Near Noss Head, Scotland (GBR)
Scope:
22,000 tons of rock
Client:
NKT
Year:
2022

Purpose:
The quantity reclaimed was 200,000 m3 through a sinker line…

Location:
Föhr, Germany
Scope:
200,000 m3
Client:
Landesbetrieb für Küstenschutz
Year:
2022

Purpose:
A long time charter contract for continuous maintenance dredging in entrance channel…

Location:
Berbice river, Republic of Guyana
Scope:
160,000,000 m3
Client:
Bauxite Company of Guyana Inc. (BCGI)
Year:
2011- 2020

Colombo South

Explore Project

Purpose:
800,000 m3 of sand distributed on the beaches Kalutara, Angulana and Mt. Lavinia…

Location:
Kalutara, Angulana, Mt. Lavinia, Sri Lanka
Scope:
800,000 m3
Client:
Coast Conservation Mgmt. Dept.
Year:
2020

Séte Frontignan

Explore Project

Purpose:
Beach nourishment project to contain erosion and limit the risk of inundations….

Location:
Montpellier, France
Scope:
180,000 m3
Client:
Sète Agglopôle Méditerranée
Year:
2019-2020

Kerawalapitiya

Explore Project

Purpose:
Sand mining & pumping for reclamation, and stock piling…

Location:
Kerawalapitiya, Sri Lanka
Scope:
3,450,000 m3
Client:
Sri Lanka Land Reclamation & Dev. Corp.
Year:
2018-2020

Hanstholm Port

Explore Project

Purpose:
Expansion of Hanstholm Harbor, in addition to further deepening of the existing fairway…

Location:
Hanstholm, Denmark
Scope:
280,000 m3 hard lime, 740,000 m3 sand
Client:
Per Aarsleff A/S
Year:
2018-2020

Borsele Offshore Wind Farm

Explore Project

Purpose:
Dredging of upper siltated sand, expansion of rock bed area and installation of additional rock…

Location:
Esbjerg, Denmark
Scope:
25,000 dredged, 40,000 rock installed
Client:
Siemens Gamesa
Year:
2019-2020

Horns Rev 3

Explore Project

Purpose:
Various remediation campaigns at a wind turbine in Horns Rev 3…

Location:
Esbjerg, Denmark
Scope:
110,000 m3, 7,000t Rock
Client:
Vattenfall Vindkraft Horns Rev 3 P/S
Year:
2019-2020

Tolmount Pipeline

Explore Project

Purpose:
Clearance of a total of 3,000 boulders has been cleared from the pipeline route…

Location:
Tolmount, United Kingdom
Scope:
3,000 Boulders, 50,000 m3 Clay
Client:
Saipem Ltd
Year:
2019-2020

Sao Luis

Explore Project

Purpose:
Maintenance dredging at Pier 1; Pier 3 North and South; Pier 4 North and South…

Location:
São Luís, Brazil
Scope:
5,037,152 m3
Client:
Vale SA
Year:
2015-2020

Klaipeda

Explore Project

Purpose:
About 30,000 m3 of moraine soil needs to be removed and dumped in offshore dumping grounds….

Location:
Klaipeda, Lithuania
Scope:
70,000 m3
Client:
Klaipeda State Seaport Authority/BMGS
Year:
2020

Paldiski 

Explore Project

Purpose:
Capital Dredging and securing slope of the Quay number 7….

Location:
Paldiski, Estonia
Scope:
600,000 m3
Client:
Ports of Tallinn
Year:
2019-2020

KDI, Danish West Coast

Explore Project

Purpose:
A long-term Beach Nourishment contract at the Danish West Coast …

Location:
West Coast of Jutland, Denmark
Scope:
Between 950,011 m3 and 3,470,335 m3
Client:
Danish Coastal Authority
Year:
2012-2019

Cluster West Adlergrund

Explore Project

Purpose:
Installation of 4 export cables totaling 300 km in length from offshore wind farms…

Location:
Lubmin, Germany
Scope:
330,000 m3
Client:
Prysmian & 50 Hertz
Year:
2017-2019

Cobra Cable

Explore Project

Purpose:
Trench dredging and backfilling works…

Location:
Eemshaven, Netherland
Scope:
4,656,000 m3 or 2,600,000 m3 in 5 sections
Client:
Prysmian Power Link, TenneT and Energinet
Year:
2018-2019

Esbjerg Port Rock Bed Construction

Explore Project

Purpose:
Cleaning existing rock beds of 24,000m3 of sand…

Location:
Esbjerg, Denmark
Scope:
33,600 m3
Client:
Siemens Gamesa Renewable Energy
Year:
2019

Rønne Port

Explore Project

Purpose:
Increasing navigation depth and facilitating quality fill…

Location:
Rønne Port, Denmark
Scope:
900,000 m3
Client:
Per Aarsleff A/S
Year:
2018-2019

Vordingborg Port

Explore Project

Purpose:
Deepening of the shipping channel to 10.4 meters and a width of 70 meters…

Location:
Vordingborg, Denmark
Scope:
1,800,000 m3 sand, 1,610,000 of boulder clay
Client:
Munck Havne og Anlæg A/S
Year:
2018-2019

Caparica Beaches

Explore Project

Purpose:
Dredging 1,000,000m3 of sand available in the access channel to the port of Lisbon…

Location:
Almada – Caparica, Portugal
Scope:
1,000,000 m3
Client:
APL-Administracão do Porto APA
Year:
2019

Purpose:
Deepening and widening of the harbor and entrance channel located at the Great Barrier Reef Marine Park…

Location:
Cairns, Australia
Scope:
750,000 m3
Client:
Ports North
Year:
2019

Offshore Thyborøn

Explore Project

Purpose:
installation of 2,500 GSCs (geotextile sand containers) for offshore wind turbines….

Location:
Nissum Bredning
Scope:
2,500 GSCs
Client:
Siemens Gamesa Renewable Energy
Year:
2018

Frederikshavn Port

Explore Project

Purpose:
Increasing navigation depth and facilitating quality fill…

Location:
Frederikshavn, Denmark
Scope:
3,220,000 m3
Client:
Port of Frederikshavn
Year:
2016-2018

Dutch Coast

Explore Project

Purpose:
Beach and foreshore nourishment on the Dutch coast…

Location:
Dutch Coastline, The Netherlands
Scope:
10,377,900 m3
Client:
Rijkswaterstaat PPO
Year:
2013-2017

Gold Coast Beaches

Explore Project

Purpose:
Dredging, Rainbowing and Bottom-dumping on the Gold Coast…

Location:
Gold Coast, Australia
Scope:
3,000,000 m3
Client:
Council of the City of Gold Coast
Year:
2017

Marawila

Explore Project

Purpose:
Offshore sand mining and beach nourishment…

Location:
Marawila, Sri Lanka
Scope:
800,000 m3
Client:
Coast Conservation Mgmt. Dept.
Year:
2016-2017

Esbjerg Port

Explore Project

Purpose:
1,100,000 cubic meters of sand were dredged to reclaim the land areas behind the quays…

Location:
Esbjerg, Denmark
Scope:
1,100,000 m3
Client:
Esbjerg Port
Year:
2016-2017

Nissum Bredning

Explore Project

Purpose:
Floatation channels for offshore installation barges…

Location:
Nissum Bredning
Scope:
220,000 m3
Client:
Per Aarsleff A/S
Year:
2017

Anchorsholme Outfall

Explore Project

Purpose:
Pre-Pipelay trench dredging works required for the 3.75km Outfall pipe….

Location:
Anchorsholme, United Kingdom
Scope:
350,000 m3
Client:
J Murphy & Sons Ltd
Year:
2017

NorNed Lowering & Remidial Burial

Explore Project

Purpose:
NorNed Lowering and Remedial Burial using Mass Flow Excavation…

Location:
The Netherlands
Scope:
17 km
Client:
TenneT TSO B.V.
Year:
2016

New Fairway Vordingborg

Explore Project

Purpose:
Design, planning and construction of the new fairway to Vordingborg…

Location:
Vordingborg, Denmark
Scope:
220,000 m3, including design and construction
Client:
Banedanmark
Year:
2016

Tauranga

Explore Project

Purpose:
Deepening and widening the entrance channel and port of Tauranga…

Location:
Tauranga, New Zealand
Scope:
5,300,000 m3
Client:
Port of Tauranga Limited
Year:
2015-2016

Devonport

Explore Project

Purpose:
Maintenance dredging in Devonport, Tasmania…

Location:
Tasmania, Australia
Scope:
260,000 m3
Client:
Tasmanian Ports Corporation Pty Ltd
Year:
2015

York Development Pipeline

Explore Project

Purpose:
Trench dredging, pre-sweep and backfilling at the East Yorkshire Coast…

Location:
East Yorkshire Coast (UK)
Scope:
7 km of trench
Client:
Saipem Ltd
Year:
2012

Sample Heading

This is a paragraph, lorem ipsum dolor simet.

Featured projects worldwide

Luctus Accumsan

Heading 2

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Duis a felis massa. Mauris varius interdum diam at varius. Donec sollicitudin tempus mi sit amet ornare.

Heading only

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Duis a felis massa. Mauris varius interdum diam at varius. Donec sollicitudin tempus mi sit amet ornare.

Heading only

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Duis a felis massa. Mauris varius interdum diam at varius. Donec sollicitudin tempus mi sit amet ornare.

Heading only

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Duis a felis massa. Mauris varius interdum diam at varius. Donec sollicitudin tempus mi sit amet ornare

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Duis a felis massa. Mauris varius interdum diam at varius. Donec sollicitudin tempus mi sit amet ornare

Click

 

 

 

 

 

This is just a sample vessel overview

    Sample heading

    Lorem ipsum dolor sit amet, consectetur adipiscing elit. Duis a felis massa. Mauris varius interdum diam at varius. Donec sollicitudin tempus mi sit amet ornare.

    Click here

    This is a sample

    This is a sample paragraph, the lazy brown fox jumped over the lazy dog.

    Click Here

    This is a sample tile compontent

    Aenean eu luctus ligula, id pharetra dui. Nam cursus egestas sapien eu ornare. Sed nec erat a massa aliquet volutpat.

    Sample Tile #1

    Lorem ipsum dolor sit amet, consectetur adipiscing elit.

    Learn More

    Sample Tile #2

    Lorem ipsum dolor sit amet, consectetur adipiscing elit.

    Learn More

    This is a sample tile compontent

    Aenean eu luctus ligula, id pharetra dui. Nam cursus egestas sapien eu ornare. Sed nec erat a massa aliquet volutpat.

    Sample Tile #1

    Lorem ipsum dolor sit amet, consectetur adipiscing elit.

    Learn More

    Sample Tile #2

    Lorem ipsum dolor sit amet, consectetur adipiscing elit.

    Learn More

    Urna Duis

    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Placerat vestibulum lectus mauris ultrices eros in cursus. Volutpat diam ut venenatis tellus in metus vulputate. Nibh tortor id aliquet lectus proin.

    Learn More

    Urna Duis

    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Placerat vestibulum lectus mauris ultrices eros in cursus. Volutpat diam ut venenatis tellus in metus vulputate. Nibh tortor id aliquet lectus proin.

    Learn More

    Urna Duis

    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Placerat vestibulum lectus mauris ultrices eros in cursus. Volutpat diam ut venenatis tellus in metus vulputate. Nibh tortor id aliquet lectus proin.

    Learn More

    Urna Duis

    Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Placerat vestibulum lectus mauris ultrices eros in cursus. Volutpat diam ut venenatis tellus in metus vulputate. Nibh tortor id aliquet lectus proin.

    Learn More

    Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed semper ut dolor nec porta. Aenean in velit id tortor scelerisque pulvinar. Interdum et malesuada fames ac ante ipsum primis in faucibus. Sed id lorem congue lorem semper finibus vel in tortor. Donec molestie ultricies felis, quis aliquet felis interdum vel. Aenean eu luctus ligula, id pharetra dui. Nam cursus egestas sapien eu ornare. Sed nec erat a massa aliquet volutpat.

    Click Here

    Test

    • Balder R
    • Njord R
    • Ask R
    • Embla R
    • Thor R
    • Sif R
    • Brage R
    • Idun R
    • Freja R
    • Trud R
    • Magni R
    • Modi R
    • Viking R
    • Tjalfe R
    • Toste R
    Hopper capacity
    6,000m3
    Length overall
    111.30m
    Breadth
    19.40m
    Draught loaded
    7.00m
    Draught unloaded
    3.80m
    Dredging depth
    35.00/65.00m
    Hopper capacity
    6,000m3
    Length overall
    111.30m
    Breadth
    19.40m
    Draught loaded
    7.00m
    Draught unloaded
    3.80m
    Dredging depth
    35.00/75.00m
    Hopper capacity
    2,700m3
    Length overall
    85.40m
    Breadth
    17.40m
    Draught loaded
    5.40m
    Draught unloaded
    2.90m
    Dredging depth
    32.00/52.00m
    Hopper capacity
    2,700m3
    Length overall
    85.40m
    Breadth
    17.40m
    Draught loaded
    5.40m
    Draught unloaded
    2.90m
    Dredging depth
    32.00/52.00m
    Hopper capacity
    2,507m3
    Length overall
    83.90m
    Breadth
    14.00m
    Draught loaded
    5.41m
    Draught unloaded
    3.47m
    Dredging depth
    25.00/28.00m
    Hopper capacity
    2,173m3
    Length overall
    80.00m
    Breadth
    13.80m
    Draught loaded
    4.87m
    Draught unloaded
    2.90m
    Dredging depth
    24.00/46.50m
    Hopper capacity
    2,170m3
    Length overall
    89.59m
    Breadth
    13.60m
    Draught loaded
    5.69m
    Draught unloaded
    4.10m
    Dredging depth
    30.00/49.50m
    Hopper capacity
    2,035m3
    Length overall
    79.00m
    Breadth
    14.00m
    Draught loaded
    4.50m
    Draught unloaded
    3.45m
    Dredging depth
    25.00/28.00m
    Hopper capacity
    1,961m3
    Length overall
    75.08m
    Breadth
    14.00m
    Draught loaded
    5.20m
    Draught unloaded
    3.50m
    Dredging depth
    28.00/34.00m
    Hopper capacity
    1,570m3
    Length overall
    75.49m
    Breadth
    12.80m
    Draught loaded
    3.80m
    Draught unloaded
    2.00m
    Dredging depth
    28.00/40.00m
    Hopper capacity
    1,570m3
    Length overall
    75.49m
    Breadth
    12.80m
    Draught loaded
    3.80m
    Draught unloaded
    2.00m
    Dredging depth
    28.00/40.00m
    Hopper capacity
    1,393m3
    Length overall
    67.05m
    Breadth
    12.80m
    Draught loaded
    3.80m
    Draught unloaded
    1.50m
    Dredging depth
    20.00/24.00m
    Hopper capacity
    1,010m3
    Length overall
    66.80m
    Breadth
    11.85m
    Draught loaded
    4.33m
    Draught unloaded
    2.85m
    Dredging depth
    20.00/24.00m
    Hopper capacity
    789m3
    Length overall
    57.50m
    Breadth
    14.80m
    Draught loaded
    3.45m
    Draught unloaded
    1.80m
    Dredging depth
    up to 100.00m
    Hopper capacity
    535m3
    Length overall
    45.70m
    Breadth
    10.50m
    Draught loaded
    3.50m
    Draught unloaded
    2.20m
    Dredging depth
    up to 100.00m